Contract mining + mine infrastructure delivery — built for predictable tonnes, safer execution, and on-time schedules.
Mining performance is rarely limited by ambition. It’s limited by execution: equipment that arrives when promised, operators who can deliver consistent cycle times, and site systems that keep ore moving from pit to plant. PW Mining positions itself as a full-scope partner across contract mining, civil engineering and construction—supporting mine owners and EPC teams with the practical delivery capacity required in Ghana and across West Africa.
Bibiani Gold Mine relevance (as announced by the operator)
Asante Gold publicly announced that it selected PW Mining (Ghana) to start mining activities at the Bibiani Gold Mine (announcement dated January 10, 2022). The operator stated that open-pit operations would include satellite pits, a staged cutback program, and total material movement planned at up to 75 million tonnes per year, supported by mobilisation of up to 125 units of heavy equipment. Asante also stated that over 850 people would be employed by PW Mining at the Bibiani site, alongside supporting facilities such as maintenance and training infrastructure.
What PW Mining delivers (core capabilities)
1) Contract Mining — Open Cast Operations
PW states competencies across the core open-pit cycle, including site clearance, overburden removal, drilling, blasting, load & haul, ROM pad management and crusher loading—built to keep production steady and plant feed consistent. PW Mining
2) Earthmoving + Civil Engineering Works
From bulk earthworks to mine-support civils, PW presents itself as a contractor able to execute heavy earthmoving and infrastructure works for mining and industrial clients. PW Mining+1
3) Equipment depth for mining-scale delivery
PW highlights an expanding mining fleet including CAT 6030 and CAT 6015 excavators paired with CAT 777 dump trucks (company-stated), supporting high-volume material movement requirements. PW Mining
Why it matters for Ghana’s producing mines
For operators, the value of a contract miner is measured in reliability: consistent tonnes, controlled costs, safe execution, and the ability to mobilise for cutbacks, satellite pits, and production ramps without losing momentum. PW Mining’s Bibiani award announcement positions the company as part of that delivery story—helping align mine plans with real-world fleet capacity and shift-by-shift execution.
Learn more: PW Mining International (

